THE FI5E HEALTHCARE PROJECT MANAGEMENT HUB

Healthcare project managers finally have a working home.

Real-world project guidance for healthcare facilities and capital delivery, medical equipment and imaging, clinical information technology and digital health, and life-sciences or medical-device work.

Generic project management stops too early.

Healthcare project managers work across facilities, construction, clinical operations, information technology, equipment, quality, regulatory teams, vendors, operations, safety, and leadership. This hub is being built around how that work actually moves—not how it looks in a textbook.

FI5E HEALTHCARE SITE VISIT STANDARD · VERSION 1.0

One project path. One complete record another authorized PM can pick up.

Every visit follows the same seven controls, while the facts and final decisions remain specific to the project.

  1. Define the visit and required outputs.
  2. Capture facts, photos, files, and questions.
  3. Classify each finding and separate observation from reported information.
  4. Assign owners and dates.
  5. Build all selected records from the same reviewed facts.
  6. Edit and approve through the proper authority.
  7. Export, confirm, and erase the workspace.
Read the operating supplement
HEALTHCARE PROJECT RESOURCES

Come in with a problem. Leave with a way to manage it.

CHOOSE THE HEALTHCARE WORK IN FRONT OF YOU

Healthcare project management is bigger than imaging.

FI5E helps manage the planning, ownership, dependencies, evidence, decisions, and handoffs in each environment. Clinical, engineering, quality, safety, and regulatory conclusions remain with the qualified authority.

Medical equipment and imaging

Coordinate facility, construction, information technology, delivery, installation, applications, readiness, and clinical turnover.

Ask Navigator about this project

Healthcare facilities and capital delivery

Connect scope, designers, construction, infection-control ownership, operations, permits, readiness evidence, and turnover.

Ask Navigator about this project

Clinical information technology (IT) and digital health

Control requirements, interfaces, cybersecurity ownership, environments, testing, cutover, adoption, support, and rollback readiness.

Ask Navigator about this project

Life sciences and medical device

Plan validation evidence, quality and regulatory ownership, change control, design transfer, launch readiness, and operational handoff.

Ask Navigator about this project
THE OPERATING REALITY

The equipment is only one part of the project.

Successful delivery requires the customer, sales, site planning, construction, logistics, installation, service, IT, clinical teams, vendors, and regulatory stakeholders to work from the same scope, schedule, responsibilities, and readiness evidence.

This specialty shows how to document critical handoffs, assign responsibilities, maintain the schedule, verify readiness, and complete customer turnover.

HEALTHCARE EQUIPMENT LIFECYCLE

Five control points from opportunity to turnover

1

Intake & discovery

Clarify the customer outcome, site conditions, scope boundaries, early costs, responsibilities, and target dates.

2

Planning & site development

Translate equipment requirements into coordinated facility, construction, logistics, regulatory, information technology, and training plans.

3

Readiness decision

Verify the real gating conditions, assign unresolved risks, and make a documented proceed, conditional, or reschedule decision.

4

Delivery & installation

Control access, rigging, inventory, installation progress, daily evidence, issues, decisions, and recovery actions.

5

Startup & turnover

Coordinate technical startup, customer preparation, training, documentation, punch-list ownership, and formal closeout.

THE FI5E WAY

See one field-tested approach. Make the final tool yours.

These are reference examples of how FI5E organizes healthcare equipment project work. They are not the only way, an industry mandate, or a completed project document. Use the thinking, change every field that needs to change, and verify the final result against your contract, organization, customer, and project.

INTAKEProject Intake

Clarify a new assignment

What it is: Intake, purpose, stakeholders, authority, early commitments, missing information, and the first actions.

Use it when: When a new project or assignment enters the delivery process.

Build from this example
SCOUT PRELIMINARYSite and Context Observation and Unified Tracking (SCOUT) Preliminary

Plan the first site review

What it is: People, drawings, access, measurements, photographs, questions, and evidence needed before design or delivery decisions.

Use it when: Before the first site visit, to plan who, what, and which evidence must be captured.

Build from this example
SCOUT FINALSite and Context Observation and Unified Tracking (SCOUT) Final

Confirm current site reality

What it is: Observed conditions, remaining gaps, interfaces, evidence, owners, due dates, and decisions that follow the visit.

Use it when: After the site visit, to preserve verified observations, open questions, owners, and required follow-up.

Build from this example
SOASolution Opportunity Assessment (SOA)

Assess the solution opportunity

What it is: Feasibility, facility impact, responsibilities, constraints, options, risks, recommendation, and decision authority.

Use it when: During pre-sale, feasibility, discovery, or early planning before commitments are made.

Build from this example
SPAStatus and Progress Assessment (SPA)

Show progress and recovery

What it is: Verified progress, forecast impact, incomplete work, responsible parties, recovery actions, and the next evidence review.

Use it when: During construction or execution when progress, variance, and recovery need a formal review.

Build from this example
PRAProject Readiness Assessment (PRA)

Make the readiness decision

What it is: Critical readiness conditions, evidence, exceptions, accountable owners, recovery dates, and documented decision authority.

Use it when: Before a phase, milestone, purchase, release, delivery, handoff, or closeout decision.

Build from this example
PROJECT PLANSequenced project schedule

Build the delivery sequence

What it is: A lifecycle example for CT, MI, MRI, or PET-CT with tasks, milestones, dependencies, owners, readiness, installation, and turnover.

Use it when: After the outcome and scope are understood and the work must be sequenced and controlled.

Build from this example
PORTFOLIO WORKSPACEMulti-project management view

Build the management view

What it is: A Smartsheet-style example for status, milestones, risks, decisions, actions, customer commitments, forecast, and leadership attention.

Use it when: When several projects or workstreams require a consistent management view.

Build from this example
READINESS REVIEWEvidence-based readiness decision

Protect the decision with evidence

What it is: Shared and modality-specific critical conditions, exceptions, decision logic, recovery planning, and authorization.

Use it when: Before an irreversible commitment when readiness must be supported by current evidence.

Build from this example
TURNOVERAcceptance and operational handoff

Transfer operational ownership

What it is: Testing, acceptance, training, records, punch-list control, support ownership, and closeout evidence.

Use it when: When completed work, records, training, support, and remaining ownership transfer to operations or the customer.

Build from this example
LIFE SCIENCES AND MEDICAL DEVICE

Planning controls for regulated delivery, without pretending to own compliance.

These examples organize the project work around the quality or regulatory system. They do not interpret requirements, approve validation, or determine compliance.

VALIDATION READINESS

Plan the evidence path

Define validation deliverables, authors, reviewers, approvers, dependencies, due dates, exceptions, and acceptance evidence without making the validation conclusion.

Build from this example
CHANGE CONTROL

Connect the change to delivery

Track the reason, impact assessment owners, affected records, approvals, implementation steps, verification, communication, and closure evidence.

Build from this example
DESIGN TRANSFER

Make ownership transfer visible

Coordinate deliverables, manufacturing and quality readiness, open risks, training, records, acceptance criteria, and accountable operational ownership.

Build from this example
LAUNCH READINESS

Run an evidence-based decision

Separate critical blockers from controlled exceptions and connect quality, regulatory, supply, training, support, release authority, and recovery dates.

Build from this example
ONE CONNECTED REFERENCE SYSTEM

Guidance, examples, planning resources, and builders.

The FI5E framework shows one connected way to think through the work. Modality examples support computed tomography (CT), molecular imaging (MI), magnetic resonance imaging (MRI), and positron emission tomography/computed tomography (PET-CT) execution, while guided builders help each PM create an editable, project-specific starting draft at the control points that matter.

Modality Project Lifecycle Plans

Repeatable project plans for computed tomography (CT), molecular imaging (MI), magnetic resonance imaging (MRI), and positron emission tomography/computed tomography (PET-CT) healthcare imaging projects.

View in Store

Project Document Builders

Guided tools that create editable starting examples for assessments, meeting records, field verifications, reports, and supporting documents.

Open the document builders

Complete Project Folder

A controlled healthcare project-folder structure that connects the portfolio record, lifecycle plan, and supporting evidence.

View in Store
BUILT FOR THE REAL HANDOFFS

Healthcare-specific examples, not renamed generic forms.

The reference library addresses the moments medical equipment PMs repeatedly have to control: site evidence, modality requirements, hospital IT coordination, rigging access, construction interfaces, installation readiness, and turnover.

DECISION CONTROL

Healthcare Imaging Project Readiness Assessment

A fillable, color-changing master assessment with shared imaging requirements, CT, MI, MRI, and PET-CT controls, evidence fields, recovery planning, and automatic Ready to Proceed, Evidence Incomplete, and Pause and Resolve logic.

IT COORDINATION

Healthcare Imaging IT Coordination Email

A guided builder for creating an editable coordination-email draft covering contacts, network drops, security requirements, picture archiving and communication system (PACS) and radiology information system (RIS) interfaces, remote service, testing, owners, and due dates.

DELIVERY LOGISTICS

Medical Equipment Rigging Request

A guided builder for creating an editable request covering equipment details, route survey, dimensions and weights, staging, protection, shutdowns, permits, lift requirements, dates, contacts, evidence, and confirmation.

SITE VISIT CONTROL

Purpose-built calendar invitations

Document the visit purpose, site contacts, access, equipment, drawings, measurements, photographs, personal protective equipment (PPE), decisions needed, and required follow-up before anyone arrives.

COMMUNITY KNOWLEDGE

Lessons from healthcare equipment PMs

Practical guidance on the questions to ask, people to involve, evidence to request, risks to expose, and relationships to build early.

PLANNED ACCESS OPTIONS

Use one guided resource or access the connected collection.

Pricing purchases access to FI5E guidance, examples, and builders. It does not make the generated document an official FI5E form or transfer project responsibility away from the user.

INDIVIDUAL TOOLS

Project Document Builders

$5-$9COMING SOON

Generate editable starting examples for forms, assessments, reports, meeting records, IT coordination, and rigging requests.

PROJECT STRUCTURE

Complete Project Folder

$29COMING SOON

The reusable folder structure and supporting organization documents for one controlled healthcare project.

ONE MODALITY

Modality Project Lifecycle Plan

$59COMING SOON

Choose one complete Smartsheet project plan for CT, MI, MRI, or PET-CT.

COMPLETE FRAMEWORK

Complete Healthcare Imaging Project Delivery Framework

$399COMING SOON

Healthcare delivery guidance, document-building tools, modality planning resources, supporting materials, and the Integrated Project Framework guide.

One-time purchase: permanent access to this framework package. Unlimited includes the same platform resources only while the membership remains active.
View every product in the Resource Store
Simple verified-veteran savings

After ID.me verification, veterans receive 20% off the one-time PM Process Guide purchase, 15% off other eligible FI5E products, and 10% off monthly, three-month, or annual FI5E Pro or Unlimited subscriptions. Discounts do not stack; the best eligible price applies.

Readiness controls

Site discovery, construction progress, gating milestones, evidence, ownership, and decision discipline.

Facility coordination

Drawings, utilities, access, structural conditions, room completion, dependencies, and contractor communication.

Delivery and installation

Logistics planning, rigging, inventory, sequencing, daily field updates, issues, and recovery.

Tools for the work

Healthcare-specific checklists, meeting formats, software approaches, and field-equipment recommendations.

HEALTHCARE RESOURCE CATALOG

Choose the full reference system or only the help you need.

Compare modality-planning resources, document builders, project organization tools, and discounted collections in one central store. All public examples use fictional information and original FI5E branding without employer-confidential content.

Browse the Resource Store