FI5E PROJECT READINESS REVIEW

Assess the evidence. Protect the next decision.

The Project Readiness Assessment can be used at any important project decision point. It does not provide a working recommendation until the required project information, evidence, ownership, and recovery dates are documented.

EVIDENCE COMPLETE FOR AUTHORIZED DECISION

Critical requirements satisfied

Every applicable critical requirement is Complete with current evidence, or N/A with a recorded rationale. The authorized owner can now record Ready to Proceed or Proceed with Conditions.

EVIDENCE INCOMPLETE

A recommendation cannot be made yet

The tool withholds its recommendation until the project information and every critical status, evidence record, owner, and required recovery date are complete.

PAUSE AND RESOLVE

Documented critical blocker remains

If one applicable critical requirement remains incomplete, the recommendation is Pause and Resolve until it is resolved and verified again.

THE OPERATING PROCESS

Readiness is a controlled review, not a ceremonial meeting.

Start early, define the evidence before asking for status, and make the decision from current facts.

1. Define the decision and authority

State the phase, milestone, purchase, release, deployment, delivery, handoff, or closeout being considered. Identify the authorized decision owner and every role needed to provide evidence or act on the result.

2. Define the readiness criteria

Separate critical conditions from supporting items. Connect each requirement to its governing source, evidence standard, accountable owner, and decision date.

3. Collect current evidence

Request records early enough to preserve recovery options. Use current observations, approvals, tests, photographs, system records, or other objective evidence appropriate to the project.

4. Assess every applicable condition

Classify each item as Complete, Incomplete, or N/A with rationale. Evidence Incomplete remains the working status until every critical condition can be evaluated.

5. Issue the authorized decision

Review the working status, rationale, exceptions, residual items, consequences, owners, and schedule effect. Record Ready to Proceed, Proceed with Conditions, or Pause and Resolve.

6. Resolve and verify again

For Pause and Resolve, assign every blocker, set recovery and review dates, obtain updated evidence, repeat the verification, and preserve the decision history.

PROJECT READINESS ASSESSMENT

Build a defensible review from current evidence.

Start blank or load a fictional pause-and-resolve example. Change every field, verify the evidence, and prepare the record for the authorized decision owner.

AUTOMATED WORKING STATUSEVIDENCE INCOMPLETE

No readiness recommendation is produced yet. Enter the project and assessment dates, then give every displayed requirement a status, evidence, and accountable owner. An incomplete item also needs a recovery date; N/A requires the rationale in the evidence field.

RequirementRequiredStatusEvidenceOwnerRecovery

The FI5E way, not the only way. This working signal supports the project manager and authorized decision owner. It does not replace technical, safety, contractual, clinical, or regulatory approval. The authorized outcome is Proceed, Proceed with Conditions, or Pause and Resolve.

Completed exports are saved privately for free repeat downloads. Included plan access is used first; otherwise the assessment export costs 4 credits, confirmed before continuing.

Create a project to save
FILLABLE PDF

Automated Project Readiness Assessment

Protected two-page layout, readiness requirements, status fields, evidence and ownership fields, recovery planning, decision authorization, and automatic ready, pause, or evidence-incomplete display in Adobe Acrobat or Reader.

Browser previews and some mobile PDF applications may not execute PDF automation. The printed decision rule remains visible for manual use.
View product pricing